PPDIOO

Step 1: Identify the customer requirements
Step 2: Compare existing infrastructre to vision
Step 3: Design the network and build the pilot

Prepare

  • High-level design (HLD)
  • Customer Requirements Documents (CRD)
  • Current state assessment Survey and Results (CSAS).

Plan

  • Site Requirements Specifications (SRS)
  • Solutions Test Plan (STP)
  • Site Survey Form (SSF)
  • Customer Requirements Document Response (CRDR)

Design

  • Low Level Design (LLD)

Implement

  • Network Ready For Use (NRFU) Test
  • NRFU Test Report
  • Implementation Log

Optimise

  • Root Cause Analysis Reports
  • MAC Reports
  • Support Contract Analysis (SMARTnet)

Operate

  • * Operation